
FOR IMMEDIATE RELEASE
|
CONTACT: 800-331-8094
www.realtrac.com |
Announces
Enhanced
Bill of Material Function
Realtrac, the real-time shop
management system, now includes a new planning Bill of
Material capability to integrate with its existing Buyout
Bill feature. A list of materials and outside services
needed to manufacture a part can be maintained by part
number or drawing number, and is available for use with
any estimate or job.
A drag and drop feature makes creating or modifying
a Bill of Material especially easy. A Realtrac user
only needs to highlight an item from an Item Master
library, use the mouse to move the item to the Bill
of Material list and enter the quantity needed to produce
a single part. A default vendor and price are automatically
inserted from the Item Master as well as showing any
quantities currently on hand or on order. The system
has the flexibility to easily accommodate new and one-time
items that may not be included in the Item Master library
and have not been used previously.
This enhancement to Realtrac simplifies the calculation
of material and outside service costs for quoting and
job costing as well as the conversion of estimates to
actual jobs . The Bill of Material for an actual job
is automatically updated to reflect the quantity being
manufactured and includes all information for making
purchasing decisions and generating purchase orders.
The new Bill of Material capability complements Realtrac's
highly regarded Complex Jobs module which graphically
tracks and schedules multi-level assemblies in real
time. Job costing and purchasing decisions for assemblies
are greatly simplified.
In addition to Bill of Material,
Realtrac's comprehensive Materials Management System
includes preparation and tracking of material and outside
service Purchase Orders. A complete Inventory Control
System especially designed for job shops tracks raw
material, finished and semi-finished parts, customer
material, tooling and fixtures.
(END)
|